Work Completion (Annexure 3) Undertaking: Stamping Technical Feasibility and Safety

Work Completion (Annexure 3) Undertaking: Stamping Technical Feasibility and Safety

Securing Meter Testing Slots: Automating the Annexure 3 Work Completion Sheet

Once you have physically installed the solar panels, mounted the grid-tied inverter, and completed the safety earthing pits, you must notify the DISCOM. The **Annexure 3 Work Completion Report** serves as the official safety declaration certifying that the plant is technically sound, safe to energize, and ready for net meter testing.

Technical Slabs and Safety Checks in Annexure 3:

  • DC Array Insulation: Declaring safe insulation resistance.
  • AC Protection: Verifying active grid isolation (anti-islanding protection).
  • Earthing Pit Values: The earth resistance values (ideally less than 5 ohms) for array earthing, inverter earthing, and lightning arrestors.

Quick Stamping via Vendor NetFlow:

  1. Go to Net Metering ? Work Completion.
  2. Choose the target consumer.
  3. Input technical results: earthing values, inverter test parameters, and cell makes.
  4. The platform merges these details into the official state layout.
  5. Download the document, get it signed by the client, and submit it to the portal to request utility inspector testing.