Securing Meter Testing Slots: Automating the Annexure 3 Work Completion Sheet
Once you have physically installed the solar panels, mounted the grid-tied inverter, and completed the safety earthing pits, you must notify the DISCOM. The **Annexure 3 Work Completion Report** serves as the official safety declaration certifying that the plant is technically sound, safe to energize, and ready for net meter testing.
Technical Slabs and Safety Checks in Annexure 3:
- DC Array Insulation: Declaring safe insulation resistance.
- AC Protection: Verifying active grid isolation (anti-islanding protection).
- Earthing Pit Values: The earth resistance values (ideally less than 5 ohms) for array earthing, inverter earthing, and lightning arrestors.
Quick Stamping via Vendor NetFlow:
- Go to Net Metering ? Work Completion.
- Choose the target consumer.
- Input technical results: earthing values, inverter test parameters, and cell makes.
- The platform merges these details into the official state layout.
- Download the document, get it signed by the client, and submit it to the portal to request utility inspector testing.